Over-Dimensional (Heavy Haulage) Transport

Using our lowbed and extendable trailer fleet, we transport construction machinery, transformers, generators and large industrial equipment safely with special highway permits, route surveys and escort coordination.

What Is Over-Dimensional Transport?

Over-dimensional transport is the movement of loads that exceed legal dimensional and weight limits on public roads using specialist equipment under official permits, rather than standard vehicles. Under Turkish regulations, any shipment that surpasses width, height or length limits, or whose axle loads exceed statutory thresholds, falls within this category. Construction machinery, high-voltage transformers, large generators, industrial tanks, wind turbine components and factory production equipment are among the most common load types.

At Çevikoğlu Lojistik, we conduct over-dimensional transport — which requires both technical and legal expertise — through engineering-backed route planning, comprehensive permit management and our experienced driver team. Every shipment presents its own unique challenge; we plan individually and keep risk as close to zero as possible.

Lowbed and Extendable Trailer Fleet

Our standard lowbed trailers, with their low-floor design, allow height-sensitive equipment — particularly construction machinery and transformers — to be transported within legal height limits. Our hydraulic-ramp models facilitate loading of self-propelled units, while our platform extension attachments provide dimensional flexibility.

Our extendable trailer fleet, with its mechanically extendable structure both longitudinally and laterally, accommodates long loads that cannot fit on a standard vehicle — such as wind turbine blades, large steel beams and marine components. The appropriate trailer configuration is selected according to load type; any chassis extension or widening operations are completed before the convoy departs.

Load Types and Sectors Served

Construction machinery (excavators, bulldozers, graders, cranes); high-voltage and medium-voltage transformers; static and mobile generators; industrial storage tanks and pressure vessels; wind energy plant components; reactor and column equipment for petrochemical plants and refineries; and heavy machinery groups for factory installation are the principal load types our over-dimensional fleet handles.

We serve clients in the energy, construction, mining, petrochemical and defence sectors, producing load-specific securing and transport solutions with our team that is well versed in sector technical requirements. We understand that each sector has different regulations and safety standards, and we prepare equipment and operational plans accordingly.

Special Highway Permit Process

A special transport permit application to the General Directorate of Highways is made for every over-dimensional shipment. The application presents the precise load dimensions, weight distribution, vehicle technical details and planned route. The approval process typically takes 3 to 7 business days, though this may vary depending on route and load characteristics. At Çevikoğlu Lojistik, we prepare these applications at the outset of the project, ensuring permits are in hand on the transport date.

Some shipments require separate approvals from more than one Regional Highway Directorate. We monitor regional boundaries along the route and, where multiple applications are needed, complete all permits in a coordinated manner. Since permit documents must be present on the vehicle, the original or notarised copy of every document is added to the shipment file.

Specialist Securing, Loading and Safety

The quality of securing for over-dimensional loads is of critical importance, both for cargo safety and the safety of other road users. A securing plan based on load mass, centre of gravity and fragility assessment is prepared for each load. Steel lashing chains, rubber protective pads, custom blocking chocks and vibration-absorbing damper systems are selected according to the load.

Loading is carried out under the supervision of an experienced team; the client's technical specialist may also be present on site during the loading process. Once loading is complete, the securing checklist is signed and documented photographically. This documentation constitutes strong evidence for both the insurer and the client against pre-delivery damage claims.

Advantages

Why Choose Çevikoğlu for Heavy Haulage?

Experienced heavy haulage service offering specialist equipment, engineering surveys and permit expertise under one roof.

Extensive Specialist Fleet

From standard lowbeds to extendable trailers, hydraulic ramps to modular platforms, our wide range of vehicles delivers solutions for every load type.

Field Route Survey

We carry out bridge capacity, tunnel clearance and overpass measurements on site, making every route safe before transport begins.

Complete Permit Management

We complete highway applications and multi-regional approvals before the transport date, reducing delay risk to zero.

Professional Load Securing

A securing plan based on load centre of gravity, combined with photographic documentation, guarantees both cargo and traffic safety.

Night Dispatch Capability

On mandatory night-transit routes, we operate fully equipped with escort vehicles, lighting and communications infrastructure.

Insured and Documented Transport

All over-dimensional shipments are covered by comprehensive cargo insurance; loading and delivery documents are maintained in full.

Process

Our Over-Dimensional Transport Process

1

Technical Assessment

We receive the load dimensions and weight, then conduct a preliminary analysis for vehicle configuration and route survey.

2

Permits and Survey

We initiate highway permits, complete the field route measurement and establish the escort plan.

3

Loading and Dispatch

We carry out loading and securing under technical supervision and track convoy movement in real time.

4

Safe Delivery

We deliver the load intact at the destination and close the process with a delivery record and photographic documentation.

Frequently Asked Questions

About Over-Dimensional Transport

Under Turkish highway regulations, a shipment is classified as over-dimensional when vehicle width exceeds 2.55 m (2.60 m for certain vehicles), height exceeds 4.00 m, length exceeds 18.75 m, or total axle loads surpass statutory limits. A special transport permit from the General Directorate of Highways and, in most cases, an escort vehicle are mandatory when any of these thresholds is exceeded. The majority of construction machinery, transformers, generators, tanks and large industrial equipment falls within this category.
Standard lowbed trailers have a fixed length and low-floor structure that keeps oversized loads within legal height limits. Extendable trailers, by contrast, have a mechanically extendable structure both longitudinally and laterally, allowing loads that are too long or too wide for a standard vehicle — such as wind turbine blades, large steel beams and industrial boilers — to be transported. Both vehicle types are in our fleet; we select the most suitable configuration for each load.
Yes. Over-dimensional loads are not secured with standard straps; custom blocking chocks, steel brackets, chain tensioning systems and vibration-reducing buffer materials are used according to the geometry, centre of gravity and fragility of the load. A securing plan is prepared before each load, and the technical team performs an inspection during loading. For sensitive equipment such as transformers and large machinery, the loading and securing operation is carried out in the presence of qualified technical personnel.
On routes passing through residential areas and city centres in particular, over-dimensional vehicles moving in daytime traffic can create problems for both safety and traffic management. Highway or provincial authority circulars may require transit during night hours (typically 22:00–06:00) on certain routes. At Çevikoğlu Lojistik, we plan night operations with the same rigour; escort vehicles, lighting and communication systems are arranged for night-time convoy conditions.
Before an over-dimensional shipment, the load-bearing capacity of all bridges on the route is queried from the Highway database; alternative routes are considered for bridges deemed insufficient. The passability of tunnel entries, overpasses, power lines and road signs for a loaded vehicle is verified through field measurements. The route survey report contains the potential critical transit points and the measures to be taken for each. This report is submitted with the permit application and serves as the key document for route approval.
Yes. We provide over-dimensional transport services on routes to neighbouring countries as well as the Middle East, the Gulf and Turkic republics. On international routes, in addition to the Turkish highway permit at exit, the national heavy transport regulations of transit countries are processed simultaneously. For project-based large equipment shipments to countries such as Iraq, Syria, Georgia and Azerbaijan, we work in coordination with our customs brokers and local partners to manage the legal process end-to-end.

Do You Have a Heavy or Oversized Load?

We are with you in over-dimensional transport from route survey to on-site delivery. Get in touch now and let us define the load-specific solution together.

Related Services

Our Other Logistics Solutions

International Road Transport

Full and partial truckload transport to the Middle East, the Turkic republics and neighbouring countries.

View details

Full Truckload (FTL) Transport

Direct delivery with a dedicated full vehicle for a single customer.

View details

Project Transport

End-to-end logistics for industrial and large-scale projects.

View details

Logistics Consulting

Supply chain optimisation and route planning consultancy.

View details